Creating a Shift in the FleetWatcher Mobile App

Use the mobile app to quickly create, customize, and activate a shift from your phone — ideal for field use and last-minute setup.

Introduction

The FleetWatcher Mobile App makes it easy to create shifts on the go. This guide walks you through starting a shift using the Material Management section and explains each part of the shift creation screen.


Navigation

To create a new shift:

  1. Open the FleetWatcher Mobile App

  2. Tap Material Management from the home screen

  3. Tap the white circle with the ➕ icon in the top right corner of the screen

This ➕ icon appears on every screen in Material Management.


Step-by-step Instructions

1. Info Section

  • Job Name – Required field that labels the shift

  • Shift Name Note – Optional internal label

  • Company – Defaults to your account; update only if using customer alias matching

2. Where Section

  • Source – Select the loading location or equipment

  • Destination – Select the dump or unload location

  • Project – Required for KPI and ticket matching

  • Tap Create New Project if the correct one isn’t listed

3. Who Section (Optional)

  • Add Foreman, Superintendent, Manager, Other 1, and Other 2

  • Tap Fill in contacts from the current Project to pre-load saved roles

4. When Section

  • Choose between Date Range or Single Day

  • Set Start Date and End Date

  • Set Start Time and End Time

5. What Section

  • Excluded Geozones / Equipment – Filters for LCA tracking

  • Material Type – Freeform label (e.g., Asphalt, Millings)

  • Phase Code – Optional ticket grouping

  • DOT – Enable if the shift/project is part of a DOT job

6. Rate Options & Rule Set

  • Select Rate Type (Hour, Ton, or Load)

  • Zone Analysis Rule Set – Used for Virtual Shift Ticket (VST) logic

7. Advanced Sections

  • Clock-In/Clock-Out – Optional pay/time tracking settings

  • KPI Targets – Add target values for Tons per Hour, First Load/Dump, etc.

  • Mainline Paving Calculator – Enter width, depth, weight, and target distance for paving shifts


Activate the Shift

When ready, scroll to the bottom of the page and tap:

  • Activate – Creates and activates the shift

  • Activate & Order Trucks – Starts the shift and opens the Dispatch workflow