Introduction
Today's Shifts displays all shift cards for the current day — including day and night shifts that start today. Each shift card summarizes key project details, material movement, shift progress, and performance KPIs.
The plus (+) icon allows users to quickly add a new shift. (For more details about creating shifts, see the Creating a Shift in the FleetWatcher Mobile App document.)
Navigation
To access Today's Shifts:
Go to: FleetWatcher App > Material Management > Today's Shifts
Shift Card Overview
Each Shift Card includes:
Shift Name and Date/Time
Project Name and Project Number
First Ticket summary (first load details)
First Arrival at Destination time
Compass Diagram showing truck status:
Left (S): Trucks at Source
Top (→): Trucks traveling to Destination
Right (D): Trucks at Destination
Bottom (←): Trucks traveling back to Source
Assigned Truck Count in the center of the compass
Source and Destination names
Load Count and Total Tons Hauled (current totals if shift is active)
Shift Completion % based on elapsed time
Actual Tons % compared to estimated tons
Shift KPIs for:
Tons per Hour (TpH): Crew and Truck
Feet per Minute (FpM)
Cycle Time
Trucking Cost per Ton (TCpT)
At-Source Time
At-Destination Time
Paving Distance (if applicable)
KPI Performance Notes
Higher = Better KPIs: TpH (Crew and Truck), Feet per Minute (FpM)
Lower = Better KPIs: Cycle Time, Trucking Cost per Ton (TCpT)
KPI Color Coding:
Green: Exceeds Target by more than 5%
Yellow: Within ±5% of Target (95–105%)
Red: Below 95% of Target
Shift KPIs are shown both for the entire shift and for the past hour.
Important: Final Cycle Time is measured from scale ticket to recorded dump time (+ Clockout Offset, if configured).
How to Access More Options
Tap anywhere on a Shift Card to open the Shift Options Menu.
From the Shift Options Menu, users can:
View KPI Graphs
View Scale Tickets
View the Map
See Incoming Trucks
Open Load Cycle Analysis (LCA)
Open Quad Analysis
View Live Load Count
Add/Edit Shift Notes
Use Mainline Paving Calculator
Review Material to Finish
Set or Edit KPI Targets
Manage Dispatch Assignments
End the Shift