Skip to main content

Completed Shifts

Use the Completed Shifts page to review past shifts, access scale tickets, and analyze shift performance.

Introduction

The Completed Shifts page allows you to view detailed records for past MMS and CMS shifts. This is the best place to check KPIs, download shift tickets, review scale data, and track project history over time.


Navigation

To access this feature:

Go to: MMS > Shifts > Completed Shifts


Page Overview

  • The default view shows yesterday’s shifts

  • Use the Date field in the top left to select any past date

  • Click column headers (e.g., Shift Name, Project) to reorder the list

  • Use filters to narrow results by Project, Source, Destination, or Shift Name

  • Click Clear Filters to reset the view


Working with Completed Shifts

View shift details:

  • Click More Info under a Shift Name to open the shift editor

  • Use the links under Project, Source, or Destination to view those items

Access performance data:

  • Click the KPIs button to view Tons per Hour, First Load/Dump, and TCpT

  • View additional metrics like:

    • Shift % Complete

    • Material Totals

    • Estimated vs. Actual Loads

Review scale tickets:

  • Click the Load Count or Net Tons values to open the Scale Ticket Summary

  • Use the Download or Export options as needed

Visual tools:

  • Click the LCA button to open the Load Cycle Analysis Graph

  • Use the Shift Notes section to review or add job-specific comments


Notes

  • Only shifts with a completed end time appear here

  • KPIs reflect final values as of the shift’s end

  • If a shift was missed or not activated, you can retroactively activate it from Scheduled Shifts to make it appear here

Did this answer your question?