Introduction:
The Plant Tonnage Report provides a breakdown of total tonnage and loads for each plant over a selected date range or specific day.
Navigation:
To access this feature
Go to: MMS > Scale Reports > Plant Tonnage Report.
Note: Users can also access the Plant Tonnage report from a link in the top right corner of the Plant Production page.
Plant Tonnage Report Details:
To generate the report, choose a preset range or select a custom start and end date, then click Generate Report. Use the available filters to refine the data by material type, project name, and more. The report can be printed or downloaded as a CSV file for further analysis.
