Shift Prerequisites

Before creating a shift, make sure your Projects, Geo-zones, and Equipment are set up correctly.

Introduction

Creating a shift in FleetWatcher requires a few setup steps to ensure everything runs smoothly. By preparing your Source, Destination, and Project information ahead of time, you’ll avoid errors and improve tracking accuracy.


Navigation

To access this information:

Go to: MMS > Shifts > Add/Edit Shifts


Requirements

1. Projects

  • Each shift must be linked to a Project.

  • Projects define:

    • The geo-zones used in the shift

    • The job site for reporting and ticket matching

Need help creating a project? See: Create and Edit Projects

2. Geo-zones

  • A Source is where material is picked up (e.g., plant, mill, excavator)

  • A Destination is where material is delivered (e.g., paver, dump site)

  • These locations must be created and assigned to the Project

Need help creating geo-zones? See: Set Up Geo-zones

3. Equipment

  • To appear in a Source or Destination dropdown, equipment must:

    • Be labeled Off Road

    • Have a Geo Radius of at least 150 feet

Set this in: Manage > Equipment > Add/Edit Equipment


Example Setups

Shift Type

Source

Destination

Project Notes

Paving

Asphalt Plant

Paver

Paver must have inner and outer radius set

Milling

Mill

Asphalt Plant

Mill must have inner and outer radius set

Material Haul

Jobsite

Plant

Only the Source is required, but adding a Destination improves tracking accuracy


Ensuring your Project, Source, and Destination are configured before shift creation saves time and ensures accurate reporting.