Skip to main content

Trucking Cost per Ton (TCpT) KPI

Track the average trucking cost per ton of material moved to evaluate job efficiency and hauling value.

Introduction

The TCpT KPI measures how much it costs to haul each ton of material on a shift. This includes trucking time, load count, and tonnage. It helps you determine whether your trucking plan is cost-effective based on actual job performance.


Navigation

You can view TCpT on:

  • Today’s Shifts – Live shift cards during an active shift

  • Completed Shifts – Final TCpT values and cost trends

  • TCpT Reports – Historical and per-truck breakdowns

  • KPI Details Popup – Explains the calculation logic


Definition

KPI

Description

TCpT

Average trucking cost per ton of material delivered during the shift


How It's Calculated

  • TCpT is calculated as:
    (Total Trucking Cost ÷ Total Tons Hauled)

  • Trucking cost is based on:

    • Hourly, per-ton, or per-load equipment pay rates

    • Total truck hours worked during the shift

    • Tonnage from scale tickets or equipment load capacity

Individual truck TCpT is also calculated and averaged across the shift


Why It Matters

  • Reveals whether your current fleet size and performance are cost-effective

  • Helps compare vendor efficiency or job phases

  • A critical KPI for profitability and job costing


Color Coding

Color

Meaning

🟢 Green

Cost per ton is below target (more efficient)

🟡 Yellow

Close to expected range

🔴 Red

Cost per ton is high or off target

Thresholds are defined in MMS Controls


Notes

  • Appears in Shift Cards, Completed Shifts, and the TCpT Report

  • Requires truck pay rate setup and load tracking

  • More accurate with scale integration or accurate default load values for equipment

Did this answer your question?