Introduction
The Material Summary page provides a read-only overview of materials hauled during the selected day. Materials are grouped by geozone (such as plants or projects) and show totals by material type.
Navigation
To access this feature:
Go to: MMS > Material Summary
Details
The Material Summary lists each geozone (plant or project site) separately.
Under each geozone, all material types are displayed.
The columns include:
Material: Name of the material hauled.
Net UST: Total tons delivered (based on scale ticket or manual load entries).
Rejected: Tons rejected and not counted toward the shift total.
Void: Loads that were voided during ticket processing.
Waste Tons: Material marked as waste (if applicable).
Total Tons: Sum of net, waste, and rejected material.
This page is read-only. There are no links or editing options.
Users can scroll through the list to view all geozones and material breakdowns for the day.
